 Apply GenNext A & B @ 3 – 6 fl.oz. / 1000 ft2 7 – 14 days apart with a dilution rate of 110 gal per acre

 Tank mix with plant growth regulator of choice

 Tank mix with deficit nutritional elements based on soil testing

 Tank mix wetting agent of choice

 Fungicides and insecticides can be added based on overall chemical compatibilities. Jar test products to validate compatibilities.

 Water-in that evening or based on instructions from chemicals being tank mixed with GenNext A & B

 Apply GenNext A & B @ 10 fl.oz. / 1000 ft2 7 days prior to aeration with a dilution rate of 110 gal per acre Water – in GenNext A & B immediately after application

 Proceed with normal aeration methods and protocols

 Apply corrective fertility treatments to brings soils to balance

 Topdress greens filling aeration holes with sand

 Apply GenNext A & B @ 10 fl.oz. / 1000 ft2 7 days after to enhance recovery Water – in GenNext A & B immediately after application

 Apply GenNext A & B @ 10 fl.oz. / 1000 ft2 twice 14 days apart with a dilution rate of 110 gal. per acre Water – in GenNext A & B immediately after application

 Prepare areas for seeding…aerify, verticut as needed the week after first application

 Seed two directions at a ¼” depth with bentgrass of choice at 2 lbs. / 1000 ft2

 Apply Gypsum @ 10 lbs. / 1000 ft2 to help flocculate soils

 Topdress lightly with a kiln dried sand and roll area after application (do not drag in sand as it moves seed)

 Apply a starter fertilizer at recommended rate. Water – in granular immediately after application